
When using the CC series as a mooring ball, please follow these simple instruction to achieve the maximum use and durabililty of this product:
- While the buoy is uninflated, lubricate both the tube and a rigid PVC pipe.
- Cut the pipe so it extends 3" (80 cm) beyond the buoy's top and bottom.
- Run a suitable size pin for your load through the top of the pipe.
- Attach the shackle to the chain at the bottom of the buoy.